The short answer
The cost of a house rendering depends on the plans, the number of views, the detail and what you plan to do with the images. That is why Buildframe does not publish a price list. We review your plans first. Then we give you a fixed quote and a delivery date. The quote does not move unless you change the scope.
This guide explains what drives the work, so you know what you are paying for and how to control it.
Why a price list would mislead you
A price list assumes every job is the same. House renderings are not. Two homes of the same size can take very different amounts of work. One has a simple roof and a standard kitchen. The other has a complex roof, a two story great room and custom millwork. A flat price would either overcharge the first or undercharge the second. Someone would lose.
So we look at your plans first. Then we can tell you exactly what the job is.
What drives the cost
1. The plans themselves
The first driver is the design. A compact plan with a simple roof takes less modeling than a large plan with many roof planes, dormers, bump outs and vaulted ceilings. Custom details add work too. Built in shelving, coffered ceilings, stone patterns and curved stairs all take time to model accurately.
The completeness of your plan set matters as well. A full set with elevations, sections and a roof plan lets us model with confidence. A partial set means more questions and more back and forth. We never guess at a missing detail. We ask.
2. The number of views
Each still is its own composition. It needs a camera angle, lighting, materials and staging. More views mean more work. The common mix is a front exterior, a rear or corner exterior, the kitchen, the living area and the primary suite. Some clients need two images. Some need twenty.
3. Film, fly over or stills
A photoreal film is a sequence of frames with a planned camera path, pacing and edit. A drone fly over needs the home placed on its lot and a surrounding setting. Exterior stills and interior stills need fewer frames but careful composition. Each format carries different work. Our guide on film vs stills vs 3D tour explains when each makes sense.
4. Finish detail and selections
Renderings with specific selections take more work than renderings with a general look. Matching a named tile, a specific cabinet door and a named paint color takes care. If you have a finish schedule, send it. If you do not, we can propose a look, but that is a different kind of task.
5. Options
If you want the same plan shown with several fronts or finish packages, each option adds work. The good news: options reuse the base model. Adding an option costs less effort than a new plan. Our finish and elevation options page explains how.
6. The setting
A home on a plain backdrop is simpler than a home in a detailed setting. A lot with trees, slopes, a lake view or neighboring homes takes more work. If you have a site plan, survey or landscape plan, send it. It makes the setting accurate and saves questions.
7. Volume and reuse
A plan range catalog of many plans lets us set a style once and apply it across the range. Models built for one job can often be reused later for new views, films or options. That reuse is one reason builders who work with us over time tend to get more from each model.
8. Changes after work starts
The biggest hidden cost in rendering is change. If the plans change after we start, the model has to change too. That is why we check your plans before we quote. Most problems show up in review, not halfway through the job. If a change does come up, we tell you what it affects before we do the work.
Why we give fixed quotes
We give fixed quotes because hourly billing puts the risk on you. You would not know the final number until the end. A fixed quote puts the risk where it belongs, on the team that reviewed the plans and set the scope.
Here is how it works:
1. You send your plans and tell us what you need. 2. We review the plan set. We check it for gaps and conflicts. 3. We tell you what we found and ask any questions. 4. We send a fixed quote and a delivery date. 5. You approve, and we start.
The review, quote and delivery date come back within 1 business day. The quote is the price for the scope you approved. If you add views, options or plan changes, we quote those separately before we do them.
How to keep the cost down
You control a lot of the cost. Here is how.
- Send a complete plan set. Floor plans, elevations, sections and a roof plan. See what to send.
- Lock the plans first. Render after the design is settled, not during.
- Send your selections. A finish schedule avoids rounds of revision.
- Choose views with a purpose. Pick the rooms that sell the home.
- Plan for reuse. If you will need options or a film later, tell us now. We will build the model to support it.
- Batch your plans. A group of plans with a shared style is more efficient than one plan at a time.
What you should expect in any quote
Whoever you work with, a good rendering quote should tell you:
- Exactly which views, films or fly overs are included.
- How many rounds of revisions are included.
- What counts as a change and how changes are priced.
- The delivery date.
- The file formats and sizes you will receive.
- Who owns the images and how you can use them.
If a quote does not tell you these things, ask.
A note on accuracy and cost
Cheap renderings often cut the step you cannot see: checking the model against the drawings. The images look fine until a buyer walks the finished home and notices the window is not where the picture showed it. Buildframe checks every model against the drawings before we render. That check is part of every quote.
And remember: a rendering shows a design, not a finished home. When you use renderings in the MLS or a listing, label them as an artist's rendering and follow your MLS rules.
Related guides
- How long does a house rendering take?
- What to send for house renderings
- How to presell a home before it is built